Excavation quantities are some of the most consequential numbers in a bid — wrong CY on a mass excavation or a deep foundation scope can result in six-figure losses. We calculate excavation volumes from structural and civil drawings using actual dimensions and depth callouts, not rule-of-thumb estimates.
CY exact
Excavation volumes
24–48 hr
Turnaround
All depths
Covered
±2%
Accuracy target
Who needs this
Excavation contractors, site work subs, foundation contractors, and GCs needing accurate earthwork quantities before subcontractor pricing arrives.
Every quantity below is pulled digitally from the drawings — no rule-of-thumb assumptions.
01Building Excavation
02Trenching & Utilities
03Backfill & Disposal
Common sources of error in excavation takeoff scopes — and what we check.
01
Depth of excavation unclear from architectural plans
02
Rock and unsuitable soils not identified until field
03
Over-excavation scope not quantified
04
Backfill spec varying by location across site
We have done excavation takeoff for these project categories.
Four steps from drawings to quantities — typical turnaround 24–48 hours.
Step 01
Upload your plan set through our contact form. Include the scope notes and bid date.
Step 02
We review the drawings, confirm scope, and send back a brief before starting.
Step 03
We measure every excavation element using digital takeoff software against your drawings.
Step 04
You receive an Excel workbook and PDF export with all quantities organized by element type.
Send a set of drawings today and receive a bid-ready estimate — accurate, local, and on time. No subscription. No retainer. Just results.