Sitework estimating requires reading civil grading plans, utility drawings, and paving layouts — often across dozens of sheets. An earthwork miscalculation or a missed utility run can swing a site budget by hundreds of thousands of dollars. We measure every site element from the civil and landscape drawings.
CY exact
Earthwork volumes
24–48 hr
Turnaround
Full site
Utilities + paving
±2%
Accuracy target
Who needs this
Site contractors, earthwork subs, GCs with site-work scope, and developers running pre-construction site budgets on commercial or residential land development.
Every quantity below is pulled digitally from the drawings — no rule-of-thumb assumptions.
01Grading & Earthwork
02Site Utilities
03Paving & Surfaces
Common sources of error in sitework estimating scopes — and what we check.
01
Cut/fill calculations spanning large grading plan sets
02
Utility conflicts between storm, sanitary, and water
03
Paving section changing across parking and drive areas
04
Landscape quantities on separate drawing set
We have done sitework estimating for these project categories.
Four steps from drawings to quantities — typical turnaround 24–48 hours.
Step 01
Upload your plan set through our contact form. Include the scope notes and bid date.
Step 02
We review the drawings, confirm scope, and send back a brief before starting.
Step 03
We measure every sitework element using digital takeoff software against your drawings.
Step 04
You receive an Excel workbook and PDF export with all quantities organized by element type.
Send a set of drawings today and receive a bid-ready estimate — accurate, local, and on time. No subscription. No retainer. Just results.